Checklist

Checklist before installing a solar plant

What to prepare and check before requesting a solar quote: consumption, grid connection, roof, permits, financing and maintenance.

Good preparation shortens the time to a quote, reduces the risk of surprises and gives you a better basis for comparing offers from different installers. Go through this list before the first conversation.

1. Consumption and bills

  • Electricity bills for the last 12 months (all metering points).
  • If available: 15-minute or hourly consumption data (ask your supplier or grid operator).
  • Do you know whether you are on public or market supply, and what the pricing model is?
  • Does your bill include billed (peak) demand and excess reactive energy? (See how to read your bill.)
  • Operating hours: weekdays, weekends, shifts, seasonal shutdowns.
  • Planned changes in consumption over the next 2–3 years (new machinery, cooling, EV chargers, heat pumps).

2. Grid connection

  • The building’s approved connection capacity (from the connection approval or contract) — plant size must not exceed it.
  • Connection voltage level (low voltage 0.4 kV or medium voltage).
  • Who your distribution system operator is (in the Federation of BiH: Elektroprivreda BiH or Elektroprivreda HZ HB; in Republika Srpska: distribution companies within the Elektroprivreda RS system).
  • Location of the main switchboard and the meter.

3. Roof or land

  • Ownership — do you own or lease the building/roof? Do you need consent from the owner or co-owners?
  • Roof type: flat, pitched, metal sheet, tiles, sandwich panels; type and condition of waterproofing.
  • Roof age and condition — panels stay 25+ years; is refurbishment planned?
  • Structure — are there building drawings or a structural calculation?
  • Shading — chimneys, vents, neighbouring buildings, trees, future construction.
  • Roof access for installation, maintenance and cleaning.
  • For ground-mounted plants: land ownership, zoning, access road, distance to the connection point.

4. Permits and regulations

  • The entity’s prosumer regime has been checked (see Prosumers in the Federation of BiH and Republika Srpska).
  • Cantonal/municipal building and use requirements have been checked (permit or confirmation that none is required).
  • For protected buildings or special zones: additional conditions.
  • Fire-safety requirements and insurance — inform your insurer about the planned plant.

5. Goals and budget

  • What is the main goal: a lower bill, predictable costs, customer requirements (emissions), backup power?
  • Indicative budget and target payback.
  • Financing model: own funds, loan, leasing, third-party ownership.
  • Who decides in the company and what do they need (study, calculation for the bank)?

6. What to ask for in a quote

  • Plant size (kWp) and the sizing rationale based on your consumption.
  • Annual yield estimate and self-consumption share, with assumptions stated.
  • Manufacturer, model and warranties for panels and inverters (product and performance warranty).
  • What is included: documentation, approvals, mounting, electrical works, protection, monitoring.
  • Delivery time and payment terms.
  • Workmanship warranty and after-sales support terms.

More questions for the installer are in Questions to ask your solar installer.

7. After commissioning

  • Access to production monitoring (app or web portal) and a contact for reporting faults.
  • Full as-built documentation, test certificates, warranty documents.
  • A plan for periodic inspections and cleaning.
  • Check the power factor on the first bills after connection — a solar plant can change the ratio of active to reactive energy.

Once you have this information, send us an enquiry — the more complete the list, the more accurate the first estimate.